Newly Arrival Hot Sale Iron Pipe

Short Description:


  • Min.Order Quantity: One container
  • Production time: usually 25 days
  • Port: Xingang Tianjin Port in China
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Product Tags

    With a positive and progressive attitude to customer's interest, our company continuously improves our product quality to meet the needs of customers and further focuses on safety, reliability, environmental requirements, and innovation of Newly Arrival Hot Sale Wood Stove Cast Iron Grates, We cordially welcome shoppers from in the home and overseas to hitch us and cooperate with us to enjoy a better future.
    With a positive and progressive attitude to customer's interest, our company continuously improves our product quality to meet the needs of customers and further focuses on safety, reliability, environmental requirements, and innovation of Cast Iron Grates, If any product meed your demand, remember to feel free to contact us. We're sure your any inquiry or requirement will get prompt attention, high-quality solutions, preferential prices and cheap freight. Sincerely welcome friends all over the world to call or come to visit, to discuss cooperation for a better future!

    Product ERW Steel Pipe
    Material Carbon Steel
    Grade Q195 = S195 / A53 Grade A
    Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2
    Q345 = S355JR / A500 Grade B Grade C
    Standard DIN 2440, ISO 65, EN10255, BS1387GB/T3091, GB/T13793JIS 3444 /3466

    API 5L, ASTM A53, A500, A36, ASTM A795

    Surface Bare/Natural Black
    Ends Plain ends
    with or without caps

    HTB12s_pRXXXXXa_apXX760XFXXXb

    Strict Quality Control:
    1) During and after production, 4 QC staffs with more than 5 years experience inspect products in random.
    2) National accredited laboratory with CNAS certificates
    3) Acceptable inspection from third party appointed/paid by buyer, such as SGS, BV.
    4) Approved by Malaysia, Indonesia, Singapore, Philippines, Australia, Peru and UK. We own UL /FM, ISO9001/18001, FPC certificates.


    learn more about certificates

    quality control

    Packing and Delivery:
    Packing Details : in hexagonal seaworthy bundles packed by steel strips, With two nylon slings for each bundles.
    Delivery Details : Depending on the QTY, normally one month.



  • Previous:
  • Next: